ISO and BRC System Audits Conducted in December 2025
30 Dec 2025
In December 2025, WOJIN completed ISO and BRC audits. The audits focused on production management, quality control, and process standardization, and reviewed the company’s overall operations.
During this process, we reviewed and checked production processes, key process controls, documentation, and product traceability in accordance with audit requirements.Through communication with the audit team, the company also identified areas for improvement, providing clear direction for continuous improvement.
This audit was not only a periodic inspection but also a review and improvement of daily management practices. The system requirements have gradually been integrated into actual production and management, helping the company continuously enhance stability and consistency.
As 2025 comes to an end, WOJIN will take this audit as an opportunity to continuously improve internal management. Looking ahead to 2026, we will continue to build on standardization and systematization to provide customers with more stable and reliable products and services.
Tag: wojin
Originally published 30 Dec 2025, updated 30 Dec 2025.
Blog
How to Choose the Right Degassing Valve Installation Method for Coffee Bags
30 Oct 2026This article briefly introduces the differences between manual and automatic coffee valve installation, and how to choose the appropriate installation method and equipment.
What is the difference between one way degassing valve and sticker valve
27 Sep 2026One way degassing valves and sticker valves can be used for packaging that requires gas release, serving the same function.
VM-04 PRO A More Flexible and Safer Valve Pressing Solution
26 Aug 2026VM-04 is upgraded to VM-04 PRO with 150mm/200mm depth options and touch-activated pressing for greater flexibility and safety.